A lovely view hopefully!  It was a big week this week on site with a lot happening.  Our 3 Velux windows were installed, the ‘crinkly tin’ finally started going up, flooring went down upstairs and the big sliding doors in the living room also went in.  With flooring down upstairs I was finally able to go up and have a look myself.  I am not a lover of heights and ladders at the best of times so the thought of wandering around up there, balancing on timber beams was not my idea of fun!

View from master bathroom

View from master bathroom, before the windows went in!

Anyway, now I have been up there, I was really able to appreciate the views across to the other side of the plot.  It wasn’t the best of days to see it from, but I can just imagine lying in bed with the sunshine streaming in – bliss!

The living room windows

The living room windows

As I mentioned in our last post, we thought we should celebrate the closing of the roof.  So on, Thursday, we took some champagne along with us to site and raised a glass to all our builders. Drinking champagne on a building site, in the cold on a Thursday afternoon is not something I ever thought I’d do.  I think the builders appreciated it anyway and even complimented us on our choice of champagne! Now if a Frenchman compliments you on your champagne choice, then you must be doing something right.

There are still a couple of windows to fit upstairs, but even with the downstairs windows fitted the difference in the temperature in the house is very noticeable.  We also no longer have the wind howling through which makes being on site a lot more pleasant.    Hopefully, the windows will be complete on Monday and then work can continue on the roof.  Unfortunately, a lot of rain is forecast for next week and rather unsurprisingly the builders can’t work on fitting a metal roof when it is wet!

Windows in

Windows in

Another important stage was that we were connected to mains drainage! The Mairie has been promising this for a while, and in the end they came a day earlier than we were expecting! We now have water, drainage and electricity – we could almost move in.

Over to The Hollies….


1 Comment

The roof, the roof, the roof is on (fire), Le toit , le toit , le toit est sur ​​(le feu)

The roof is almost there!

The roof is almost there!

Well, not quite on fire thank goodness, but it is on! Finally, we can stand in the house and not get rained on. There is still a way to go with all the different layers, but it is one step closer.  There was talk of using scaffolding to get the roof on to the South side, but fortunately they found a way as it was not an expense that we wanted.  We are still hopeful that the windows will be put in by the end of the month, making the building watertight!

Tom is hoping that the carpenters will join us for a ‘Topping Out‘ ceremony  In building construction topping out is a builder’s rite traditionally held when the last beam (or its equivalent) is placed atop a structure during its erection.  According to Wikipedia (that fountain of knowledge) the practice of “topping out” a new building can be traced to an ancient Scandinavian religious rite. A tree was placed on top of a new building to appease the tree-dwelling spirits displaced in its construction. Long an important component of timber frame building, it migrated initially to England and Northern Europe, thence to the Americas.  Hopefully, it will be Champagne all round, well when in France….

While we were on site today, Tom even took the chance to explain to Molly the insulating properties of Pavatex.  As you can see, she was very excited.

Molly learns about Pavatex

Molly learns about Pavatex

We have also be spending a lot of time in Leroy Merlin, Cedeo and Dupont looking at bathrooms and fencing. Some big decisions need to be made over the next week and we can’t make these without seeing the type of bath, loo, taps and sinks that we will have.  As always it is hard not to get carried away! Slightly less exciting, but just as important is the dry lining and door packages.  Tom is doing his best to get me enthused about this, but compare this to choosing baths and there is no contest.

Rain is forecast for the next couple of days, so I think a trip to Ikea in Bordeaux might be on the cards.  I wonder how the French Ikea experience will compare to that of the one in Croydon?

 


Leave a comment

There’s room enough for two, up on the roof….Il ya assez de place pour deux sur le toit

Fixing the pavatex pavatex

Fixing the pavatex

The roof is beginning to go on!  For the first couple of days this week the builders fitted the purlins on the north and south elevations.  Then today they started to fit the Pavatex and waterproof membrane to the north side of the house.  Pavatex is a high-quality insulation made from renewable raw material wood.  It also gives better protection against cold, heat, noise and fire.

The builders are confident that the north elevation will be finished by the end of the week, but have warned us that the south side will be a lot more complicated because they can’t get the manitou to this side of the house.  Therefore, they have to get the materials to this side of the house and on to the roof some other way.

The roof will be clad in timber, but below that there are a number of other materials.  Underneath the timber there is lightweight metal roof (crinkly tin ‘in the trade’) to help keep the rain out.  Below this is a waterproof membrane (to also help keep the rain out), then woodfibre board (Pavatex), then the purlins with more woodfibre in between.  Below this would be our ceiling.  I am told this is a fairly standard roof style, but if it keeps the rain out, that is fine with me.

Roof detail

Roof detail

New French words I have learnt  (I will expand on this as the weeks go by);

There are some particularly interesting ones this week…..

Placo – Plasterboard
Placo feu – Fireboard
Placo phonique – Acoustic plasterboard
Ossature metal – Studwork

Poêle à bois – Log stove
Parpaings – Blockwork
Concrete – Béton
J’ai  une faim de loup – I’m a hungry Wolf.   I’m reading (or attempting to read) ‘Tintin au Tibet’, in the hope it will improve my French.  (From this you can read that I am just doing it as an excuse to read Tintin)
Hors d’eau – Water tight
Hors d’ait – Air tight
La poute – beam
Poussez les dents – teeth coming through!
Baies coulissantes – Siding doors
Casque de chantier – hard hat.
Sous-sol – basement
La Renouée du Japon – Japanese knotweed


Leave a comment

Our house, it has a crowd, there’s always something happening – Chez nous il y a beaucoup de monde, Il y a toujours quelque chose qui se passe.

Taking shape

Taking shape

Just a few photos to update you on the progress of the house.  These were taken just before Christmas.  Work is due to start on site again tomorrow.  We are expecting and hoping for a flurry of activity.