Our request for planning permission – notre demande de permis de construire

Over the last couple of months Tom has been working hard to get the planning documents together to send to the Mairie in Montemboeuf.  Having never put in a planning application in to UK planners before I am not sure how much more onerous this process was – other than the fact it all had to be in French!

Our Planning Application is finally in!

Our Planning Application is finally in!

Along with the application form itself, we had to send 4 copies of the following to the Mairie;

  • Location Plan between 1/5000 and 1/25000;
  • Site Layout Plan (with infrastructure) between 1/50 and 1/5000;
  • Elevations;
  • Written description of the project;
  • Landscape Plan (showing in cross section relation of building local landscape);
  • Photographs of site in proximity and from a distance;
  • Coloured drawing that shows building in relation to surrounding environment
Plan en coupe du terrain et de la construction

Plan en coupe du terrain
et de la construction

In January 2013, the French introduced new energy efficiency regulations called Réglementation Thermique 2012 (RT2012) so we had to submit a declaration (attestation) that our proposed works comply with RT2012.  Thankfully, we know a French Architect who has already set up her own practice near Dijon, so she was able to give us a contact for an engineer!  He was very helpful and gave us a lot of ideas of how we could make our house as thermally efficient as possible.

Once the application is submitted they have 2 months to let us know if we have been successful or not.  If we do not hear with in this time we can take it that we have received tacit authorisation! However, only today did we hear back from the local Mairie informing us that they had received our application on 16th December 2013 – so the countdown to 16th February 2014 starts….

However, they have asked us to show them how we plan to connect to the drainage system and ask that we contact the local ‘technical services’ to discuss the connection work. So once we have confirmed this our 2 month countdown starts.   At least this wasn’t a ‘No’!  So keep your fingers crossed for us.

We would like to thank everyone who has helped us get this far. Naik in Tom’s office for help with the French translation and application form.  Also to our good friend Marine at Atelier Zero Carbone Architectes who helped with the process of the French Planning system.  She also put us in contact with Athermia who did our Bbio RT2012 thermal calculations.


2 Comments

New designs to take to the French planners

Apologies that things have been a little quiet on here of late, but this is because Tom and I (well mainly Tom) have been working hard on our new designs.  We are off to France soon for the Medoc Marathon and we have managed to book a meeting with the planners in Confolens on 5th September to show them our ideas before we submit our formal planning application.  The idea behind this is that they will make their comments there and then and if there are changes then we can make them before we submit in the hope they will grant planning permission with no delays or changes….nous souhaitons!

Garden perspective

Garden perspective

The new design is similar to the old with the idea of a living space at one end and sleeping at the other, but it now has more of a barn style feel.  It also takes away the flat roof in the living end of the house and now incorporates a double height space – something Tom has always been keen on.  We have also included a covered outdoor area which has easy access from the living end of the house.  Tom has also found a building company close by that specialises in ‘green architecture’ and can also make pre-fabricated straw bale walls!  This is something that we are both interested in so I think we will be paying a visit to their factory as well.

We have also asked my brother-in-law, Al, a talented young Landscape Architect to draw up some plans for our garden.  He has come back with some initial ideas which we are very excited by.  These designs will appear here and on our design pages soon.


1 Comment

Planners and runners

Our designs are moving on a bit and we will be adding them to the Design page soon.  In the meantime Tom has contacted the planners to arrange another meeting.  So far the fabled ‘French bureaucratic system’ has not caused us any problems.  It has all be quick and efficient.  Maybe it is just that, a fable, then again we have all seen Grand Designs…..On which note we watched a bit of a classic Grand Designs abroad the other night all about a couple who were planning to build a timber framed house in The Lot.  Our design we will very different from this, but it is still interesting to see. Anyway, we will be updating these pages shortly with more news on the planners and our designs.