lespetitesgarennes

Our Grand Design in Montemboeuf, Charente, France


Leave a comment

These wires are out of control – Ces fils sont hors de contrôle

Kitchen wires

Kitchen wires

Apologies for the lack of posting recently, but life sort of took over.  Molly started nursery, but was then sick and I was due to go back to work, but then also became ill.  I have just about recovered now and I am recuperating in France! Sadly not in Cannes where most people seem to go for that sort of thing, but La Rochefoucauld is very lovely!

We are also a little behind schedule, but inevitably these things happen.  Unfortunately, not having been on site for six weeks has meant that things have moved more slowly than expected.  Even though we are behind on the program that the builders had given us, the site had changed considerably in 6 weeks.  Externally, the site is looking a lot tidier for a start which makes the approach to the house a lot more welcoming.  This is further helped with the very beginnings of the landscaping. We’d contracted ‘An English Nursery in France’ to plant a hedge for us and to do some tree pruning and the work they did has made a big difference to the front of the house. Hedging plants seem to be very expensive in France.  We were very keen to use our local pépinière, but it would have been cheaper to buy the plants in the UK and drive them over.  This of course, would have not been very good for the plants! 

The pergola had also been finished and we were now able to see Tom’s design of a seamless continuation of cladding of the house and pergola in action.  I can’t wait to be sitting there with a glass of pineau watching the sun go down.  I am sure some of you would like to join me!?

However, it is on the inside of the house that the biggest changes have happened.  We now have some walls, ceilings, the beginnings of a staircase and lots and lots of wires, pipes and ducts everywhere.  As I have mentioned before, it is difficult to imagine how the layout of the house will look or gauge the sizes of the rooms from the architect’s drawings. When we were last in the house, before the partitions went up, I could not visualise the space and wondered how we would fit two en-suite bedrooms downstairs.  Visiting the site again, with the partitions up, I can’t believe how large the areas are.  It just goes to show that you really need to see a house with internal walls before you worry about the space!

The walls that have been put up enabled us to see that all important framed view that I had wanted Tom to design right from the beginning of the project.  It was very exciting to finally see it. Hopefully in the next couple of weeks all the walls will be up!

We now have a bit of careful time and project management to work on.  It is also vital that the interaction between our mason, plumber, electrician and main builder works as smoothly as possible. We have to time the delivery of our kitchen correctly because there was no way our mason, who is doing the tiling can do a good job on the tiling with big kitchen boxes in the way!  It is therefore important therefore that the tiling is finished before we take delivery of the kitchen, but this meant that first fix plumbing and electrics had to be finished before the tiling can start.  This organisation of the trades was going to be difficult once back in the UK, so we will have to keep our fingers crossed that until Tom can get back to site things run smoothly with all the trades!

 

Over to you Franz Ferdinand


Leave a comment

Sometimes all I need is the air that I breathe – Quelquefois, tout j’ai besoin est l’air que je respire

Air tightness test

Air tightness test

The results are in….

At the end of February we had an air tightness test. Achieving a good level of air tightness is important for the energy efficiency of the building.  The benefits of improved insulation and more energy efficient heating systems such as the ones was have installed would be lost if warm air leaked out of the building and cold air leaked in.  Too much air leakage can lead to unnecessary heat loss and possible discomfort, which anyone in the house would feel as draughts.   To carry out this test, the company arrived and fitted a temporary airtight screen to our front door.  They then mounted a big fan to the screen which blew air in to and out of our house so that they could create a pressure difference between the inside and outside of 50 Pascals.  To pass an air leakage test in England and Wales, a home must achieve an air permeability result of 10 m3/(h.m2).  By the end of our build we will hope to achieve 0.6 m3/(h.m2) which is far in excess of UK building regulations and is almost Passivhaus standard which is 0.2 m3/(h.m2.).  At the end of this interim test we would not expect to achieve our desired result, but doing a test at this stage would allow us to seal up any major leakages through the construction. It was all quite exciting on the day and as we waited for the results.  The results came in and….we achieved 0.8 m3/(h.m2). I think this far exceeded what Tom expected to achieve at this stage, so he was very pleased that when they ran the test again they attained the same results!

It’s all yours, The Hollies….