Our Grand Design in Montemboeuf, Charente, France


4 Comments

As promised, concrete! – Comme promis, le béton!

Lafarge truck

Lafarge truck delivering concrete!

In my last post, I hoped to show you something a little more ‘concrete’ when I next wrote. That time has now arrived!  A big Lafarge truck turned up on our site today to deliver and lay a lot of concrete for our foundations.  I know concrete isn’t the most environmentally friendly of products, but it was our best option and meant we didn’t spend a fortune ‘getting out of the ground’.  We will also be having a concrete slab, which is great for thermal mass, something which will be very important during those Charente summers.

Anyway, this is the start of the foundations and is a very exciting moment in the build.  It really feels as though it has started now and that we have officially ‘broken ground’.

For me, it also gives an idea of the scale of the build for the first time.  You always see people in Grand Designs standing in the frame of their house gawping at the size and scale of what they are building and now I am one of those people.  I am sure that this will only be confounded once our frame goes up.  What we are building isn’t huge, but it is good to get an idea. If you’re lucky, I will post more pictures of concrete tomorrow….


1 Comment

Rock stops play? Roche arrête le jeu?

rock

Rock didn’t stop our trusty builders

Fortunately not as it turns out!  Our builders did come across some rock which I thought meant disaster when Tom first told me.  I had visions of vast costs involved to remove that rock in some very unenviromentally friendly way – and that roll top bath becoming ever further from my reach.  Apparently tough it would have been a good thing – rock being a good base for foundations.  This could have meant a saving in the cost of foundations – that bath was on its way back….In then end, the rock was just in a small area and was nothing to worry about or be thankful for.

Our builders continue to make good progress and as the sun still seems to be shining in Montemboeuf, hopefully there will not be any delays due to bad weather.  I just hope they don’t get the weather we’ve had in London any time soon, or that pool that we want will be built a little earlier than expected.

Trench footings

Trench footings

The photo above shows the start of our foundations and Tom tells me the metal caging has also gone in which reinforces the foundations.  I don’t have much more to say about that, apart from it is very exciting – more so than just your average hole in the ground with bits of wood in anyway.  Hopefully in the next post I’ll have some photos of something more concrete as it were…..


Leave a comment

The building begins – la construction commence!

Perspective Image © Thomas kyle

Perspective Image © Thomas Kyle

So, here we are, nineteen months after our initial plot search, we are about to start building!  Please, don’t get me wrong, this hasn’t been a slow and laborious process, these things just take time.  We had to find the plot, buy it, work up designs, take them to the planners, work on the designs some more to get them right before submitting them planning permission.  Then, once planning permission was granted 2 months later, more detailed designs had to be drawn up to take to the builders and we then had to chose our builders – which is definitely something you need to take time over.  The time it has taken to get this far has nothing to do with French bureaucracy – which contrary to anything you may have heard was very quick and efficient – or us dragging our heals (although having a baby may have slowed things down a little), it is just that building a house takes a long time and we haven’t even had the metaphorical brick laid yet.  This is about to change though!

We have chosen our groundworks builder and have written to the Mairie notifying them of our Déclaration d’ouverture de chantier, basically informing them of our plan to start on site.  Tom had a long chat with our preferred groundswork builder and all being well we will start building on 16th/17th September!  We are both excited and nervous in equal measure, but really pleased to be finally starting on site.  We will try to post as many progress photos as we can to keep you updated, it just depends on when we can get to site. I just hope it doesn’t go all ‘Grand Designs’ on us with adverse weather and dodgy ground, but because we did our etude de sol the later shouldn’t be a problem, the former, well we just have to hope that the Charente doesn’t suddenly get some odd weather patterns……

See you soon, hard hats and hi-vis jackets on!

New French words I have learnt  (I will expand on this as the weeks go by);

Casque de chantier – Hard hat.

Sous-sol – basement
La Renouée du Japon – Japanese knotweed